This was an expansion of the existing facility, which was designed to process and compress raw natural gas and associated liquids to make saleable spec sale gas, NGL and stabilized condensate. The scope of work included early construction collaboration with engineering to determine tie-points, pile cutting and capping, stick-built structural steel erection, pipe rack/equipment module setting, off-module piping installation and commission support.
Categories:
Facility Construction, Project Management, Early Construction Involvement
Location:
N. E. BC
Duration:
10 months
Completed:
2019