The Water Hub Water Treatment Facility was designed to treat produced water from pipeline and truck-in stations. The scope of work included pile cutting and capping, stick-built structural steel erection, pipe rack/equipment module setting, off-module piping installation and commission support.
Categories:
Facility Construction, Project Management
Location:
N.E. BC
Duration:
2 months
© 2024 Alstar Group